Program

Tuesday, October 22, 2013

7:45am 8:15am Registration
Session 1: Systems and Software Estimation. Chair: Richard Selby (Northrop Grumman and USC).
8:15am 8:20am Richard Selby (Northrop Grumman and USC) and Jo Ann Lane (USC), “Welcome
8:20am 9:20am Keynote presentation: Barry Boehm (USC), “Broadening the Use of Cost Models to Understand -€“ilities, Tradeoffs, and Business and Engineering Decisions” ilities Trades & Affordy Analysis C-Forum 2013
9:20am 9:45am Brad Clark (Software Metrics Inc.), Ray Madachy (Naval Postgraduate School), Barry Boehm (USC), and Wilson Rosa (Department of Homeland Security), “Software Cost Estimation Metrics Manual Online” Software Cost Estimation Metrics Manual Online
9:45am 10:10am Cheryl Jones (U.S. Army Armament Research, Development, and Engineering Center), John McGarry (U.S. Army Armament Research, Development, and Engineering Center), and James Judy (Office of the Deputy Assistant Secretary of the Army for Cost and Economics), “Estimating Software Maintenance Costs for US Department of Defense Systems” COCOMO SW Maintenance Cost Estimation – 22 Oct 13 – Rev 2
10:10am 10:30am Break
Session 2: Understanding -€“ilities, Tradeoffs, and Business and Engineering Decisions. Chair: Jo Ann Lane (USC).
10:30am 10:55am Supannika Koolmanojwong (USC), Jo Ann Lane (USC), Rachchabhorn Wongsaroj (Bank of Thailand and USC), Thammanoon Kawinfruangfukul (USC), and Barry Boehm (USC), “Top Enablers and Inhibitors of Affordable Systems” CIIforum_2013_Supannika_Koolmanojwong
10:55am 11:20am Gan Wang (BAE Systems), “Quantifying the Generalized Reuse Framework in COSYSMOQuantifying the Generalized Reuse Framework
11:20am 12:10pm Panel: “Cost Modeling for Tradespace and Affordability in Systems and Software“.  Moderator: Barry Boehm (USC). Affordability & Tradespace PanelSEBoK SysLC Process Drivers&Choices BB 0811 2012
12:10pm 1:00pm Lunch
Session 3a: (parallel workshop).  “Affordability and Tradespace”.  Co-Chairs: Barry Boehm (USC) and Jo Ann Lane (USC).
1:00pm 2:50pm Workshop presentations and discussions
2:50pm 3:10pm Break
3:10pm 5:00pm Workshop presentations and discussions (continued)
Session 3b: (parallel workshop). “Operational Analysis Measures for Program Start Up”.  Co-Chairs: William Golaz (Lockheed Martin) and Greg Niemann (Lockheed Martin).
11:05am 12:00pm Workshop presentations and discussions
12:00pm 1:00pm Lunch
1:00pm 2:50pm Workshop presentations and discussions (continued)
2:50pm 3:10pm Break
3:10pm 4:00pm Workshop presentations and discussions (continued)
5:30pm 8:00pm Affiliate Dinner

Wednesday, October 23

7:45am 8:15am Registration
Session 5: Data Analysis and Modeling.
8:15am 8:40am Jairus Hihn (Jet Propulsion Laboratory), Lisa Van Der Aar (Glenn Research Center), Manuel Maldenaldo (Goddard Space Flight Center), Pedro  Martinez (Johnson Space Center), and Grant Tregre (Goddard Space Flight Center), “How NASA Estimates Software Cost: Findings and Recommendations” NASA SW Cost Improvement final
8:40am 9:05am Brad Clark (Software Metrics Inc.), Cheryl Jones (U.S. Army Armament Research, Development, and Engineering Center), John McGarry (U.S. Army Armament Research, Development, and Engineering Center), Robert Charette (ITABHI Corp.), Chris Miller (Quantitative Software Management), and Doug Putnam (Quantitative Software Management), “Software Maintenance Cost Estimating Relationships – One Size Does Not Fit All” SWM CERs One Size Does Not Fit All v1
9:05am 9:30am Arlene Minkiewicz (PRICE Systems), “Software Data Collection – A Case Study” AM – Supporting Defendable Cost Estimates- FINAL
9:30am 9:55am Dennis Goldenson (Software Engineering Institute), Bob Stoddard (Software Engineering Institute), and Ricardo Valerdi (University of Arizona) “Improving Group Decision Making Under Uncertain Circumstances: Applications in Defense Acquisition2013 COCOMO – Goldenson Expert Judgment-v020
9:55am 10:15am Break
Session 6a: Modeling.
10:15am 10:40am Ramin Moazeni (USC) and Daniel Link (USC), “Multi-Build Software Cost Estimation Using COINCOMO” Multi-Build Software Cost Estimation Using COINCOMO
10:40am 11:05am Rachchabhorn Wongsaroj (Bank of Thailand and USC), Jo Ann Lane (USC), Supannika Koolmanojwong (USC), and Barry Boehm (USC), “Can COCOMO II Estimate Big Data Project?” 2013-10-23_COCOMO_BigData_Rachchabhorn_Wongsaroj
Session 6b: Lifetime Achievement Award.  Chair: Barry Boehm (USC).
11:05am 11:10am Barry Boehm (USC), “Announcement of Lifetime Achievement Award Recipient
11:10am 12:00pm Presentation by recipient of Lifetime Achievement Award: Cheryl L. Jones “Impact and Relationship of Measurement and Cost Estimation”
12:00pm 1:00pm Lunch
Session 7a: (parallel workshop).  “In-Depth View of Software Maintenance Cost Estimation Across a Program’s Lifecycle”.  Co-Chairs: Cheryl Jones (U.S. Army Armament Research, Development, and Engineering Center) and Brad Clark (Software Metrics Inc.).
1:00pm 2:50pm Workshop presentations and discussions
2:50pm 3:10pm Break
3:10pm 5:00pm Workshop presentations and discussions (continued)
Session 7b: (parallel workshop). “COSYSMO Extension as a Proxy for Systems Estimation”.  Co-Chairs: Garry Roedler (Lockheed Martin) and Reggie Cole (Lockheed Martin).
1:00pm 2:50pm Workshop presentations and discussions
2:50pm 3:10pm Break
3:10pm 5:00pm Workshop presentations and discussions (continued)
Session 8: Tools Fair and Reception. Organizer: Julie Sanchez (USC).
5:00pm 6:30pm Tools Fair and Reception

Thursday, October 24

7:45am 8:15am Registration
Session 9: Modeling, Estimation, and Improvement.
8:15am 8:40am Bob Ferguson (Software Engineering Institute) and Dave Zubrow (Software Engineering Institute), “QUELCE Applied in a Retrospective Analysis
8:40am 9:05am Robert Stoddard (Software Engineering Institute), Dennis Goldenson (Software Engineering Institute), and Rhonda Brown (Software Engineering Institute), “Harvesting Reference Points for Cost Estimation A Step in the SEI QUELCE Cost Estimation Method” 2013 COCOMO – Stoddard – Harvesting Reference Points for Cost Estimation-v040
9:05am 9:30am Jairus Hihn (Jet Propulsion Laboratory) and Scott Morgan (Jet Propulsion Laboratory), “Bootstrapping Process Improvement Metrics: CMMI Level 4 Process Improvement Metrics in a Level 3 World“ Bootstrap Process Improvement Metrcs__final_version2011 state of sw External release
9:30am 9:55am Alexey Tregubov (USC), Lucas Rena (USC), Felipe Ferreira (USC), and Jo Ann Lane (USC), “Modeling Kanban Scheduling in System of SystemsTregubov_Alexey_Modeling Kanban scheduling in System of Systems-5
9:55am 10:15am Break
Session 10: Estimation and Methodology.
10:15am 10:40am Ramin Moazeni (USC) and Daniel Link (USC), “Lehman’s Laws and the Productivity of IncrementsLehmans Laws
Session 11a: (parallel workshop).  “Constructive Space Systems Cost Model”. Co-Chairs: Barry Boehm (USC) and Jo Ann Lane (USC).
10:40am 12:00pm Workshop presentations and discussions
12:00pm 1:00pm Lunch
1:00pm 2:50pm Workshop presentations and discussions (continued)
2:50pm 3:10pm Break
3:10pm 4:00pm Workshop presentations and discussions (continued)
Session 11b: (parallel workshop). “COSYSMO”.  Co-Chairs: Gan Wang (BAE Systems), Garry Roedler (Lockheed Martin), and Mauricio Pena (USC).
10:40am 12:00pm Workshop presentations and discussions
12:00pm 1:00pm Lunch
1:00pm 2:50pm Workshop presentations and discussions (continued)
2:50pm 3:10pm Break
3:10pm 4:00pm Workshop presentations and discussions (continued)
Session 12: Workshop Summaries.  Chair: Richard Selby (Northrop Grumman and USC).
4:00pm 4:10pm Workshop 3a Summary. “Affordability and Tradespace“.  Co-Chairs: Barry Boehm (USC) and Jo Ann Lane (USC).
4:10pm 4:20pm Workshop 3b Summary. “COSYSMO“. Co-Chairs: Gan Wang (BAE Systems), Garry Roedler (Lockheed Martin), and Mauricio Pena (USC).COSYSMO Reuse Framework Delphi Outbrief
4:20pm 4:30pm Workshop 7a Summary.  “In-Depth View of Software Maintenance Cost Estimation Across a Program’™s Lifecycle“.  Co-Chairs: Cheryl Jones (U.S. Army Armament Research, Development, and Engineering Center) and Brad Clark (Software Metrics Inc.).SW Maint Workshop Outbrief
4:30pm 4:40pm Workshop 7b Summary.  “COSYSMO Extension as a Proxy for Systems Estimation“.  Co-Chairs: Garry Roedler (Lockheed Martin) and Reggie Cole (Lockheed Martin). COSYSMO Extension as a Proxy Systems Cost Estimation – Outbrief1
4:40pm 4:50pm Workshop 11a Summary.  “Constructive Space Systems Cost Model“.  Co-Chairs: Barry Boehm (USC) and Jo Ann Lane (USC).
4:50pm 5:00pm Workshop 11b Summary.  “Operational Analysis Measures for Program Start Up“.  Co-Chairs: William Golaz (Lockheed Martin) and Greg Niemann (Lockheed Martin). 2013Operations Analysis WorkshopOutbrief
5:00pm 5:05pm Barry Boehm (USC), Jo Ann Lane (USC), and Richard Selby (Northrop Grumman and USC), “Closing Remarks and Adjourn”