COCOMO II - Constructive Cost Model

Model(s) Monte Carlo Risk
Auto Calculate

Software Size                Sizing Method


SLOC  % Design Modified % Code Modified % Integration Required Assessment and Assimilation
(0% - 8%)
 Software Understanding
(0% - 50%)
Unfamiliarity
(0-1)
New







Reused





Modified









 Software Scale Drivers
Precedentedness
Development Flexibility
Software Cost Drivers
Product
Required Software Reliability
Data Base Size
Product Complexity
Developed for Reusability
Documentation Match to Lifecycle Needs
 
 
Architecture / Risk Resolution
Team Cohesion
 
Personnel
Analyst Capability
Programmer Capability
Personnel Continuity
Application Experience
Platform Experience
Language and Toolset Experience
 
Process Maturity
 
 
Platform
Time Constraint
Storage Constraint
Platform Volatility
Project
Use of Software Tools
Multisite Development
Required Development Schedule
Software Labor Rates
Cost per Person-Month (Dollars)

Results               
Software Engineering

Effort = 0 Person-months
Schedule = 0 Months
Cost = $0

Phase Distribution
PhaseEffort (Person-months)Schedule (Months)Average Staff Cost (Dollars)
Inception0.00.00.0 $0
Elaboration0.00.00.0 $0
Construction0.00.00.0 $0
Transition0.00.00.0 $0

Staffing by Phase
 0.0  0.0  0.0  0.0 
 Inception  Elaboration  Construction  Transition 
Software Effort Distribution for RUP/MBASE (Person-Months)
Phase/ActivityInceptionElaborationConstructionTransition
Management0.00.00.00.0
Environment/CM0.00.00.00.0
Requirements0.00.00.00.0
Design 0.00.00.00.0
Implementation0.00.00.00.0
Assessment0.00.00.00.0
Deployment0.00.00.00.0
Your output file is http://csse.usc.edu/tools/data/COCOMO_November_23_2009_04_03_35_408358.txt

Created by Ray Madachy at the Naval Postgraduate School. For more information contact him at rjmadach@nps.edu